assetsolve.

Find your next move.

ProductAPM Bridge

From an asset signal to an approved action.

ProductSTO Control Tower

One operating picture for the entire turnaround.

ProductMRO Nexus

Keep the equipment, the work, and the decision connected.

ProductSafe Work Clearance

The right work. The right controls. The right authority.

ProductPSM-OS

Process safety as a connected operating discipline.

ProductSafety Intelligence

Turn observations into accountable follow-through.

ProductMinMax Inspection Intelligence

Every reading keeps its subject, its revision, and its history.

ProductHVC Commodity Operations

Keep commercial intent connected to physical and financial truth.

ProductAssetSolve SCM

Design the supply chain around the decision that matters.

ProductWorking Capital Finance Suite

A clear path from finance exceptions to reconciled outcomes.

ProductTime & Labor Cost Control

Connect work performed with the cost that reaches the ledger.

ProductEnergy Finance Operations

Make industry-specific finance work as one connected process.

Search the AssetSolve portfolio. Press Escape to close.

ASSETSOLVE PLANNING TOOLS

Finance close capacity

Estimate effort released across recurring close cycles without assuming a reduction in financial controls.

YOUR ASSUMPTIONS

Use your own baseline. Keep confidential business information out of shared links.

Annual capacity equivalent$96,000
Annual hours released960

The calculation

Annual capacity equivalent = people × released hours per cycle × cycles per year × loaded hourly cost. This is an effort estimate, not a forecast of realized cash.

Planning output based on the assumptions you enter. Final value, cost, quality, scope, and commercial terms require validation.

Discuss the assumptions
YOUR NEXT MOVE

Start with clarity.

Your initial assessment is on us.

Start a free assessment